Saturday, December 21, 2013

December 2013- Week 3

ORGANIZATION SKILLS
This week was a very effective week. I got halfway done through my second cake, in which I am planning to finish next week after my vacation.
COMMUNICATION WITH SUPERVISOR
I haven’t communicated with my supervisor, but will do as soon as I am halfway through my second cake, asking suggestions and the like.
INFORMATION

This week, I managed to finish half of my wedding cake (3 tiers). However, along the way, I made a few changes and adjustments. The first adjustment was to brush off not only white but silver glitter to the royal icing. Then, the second change was that the second tier’s background design is switched with the fifth tier, as I realized the technique is better enhanced with no buttons or sash. I also faced the temperature problem. I couldn’t cover my tiers when it’s raining, or else the fondant will get wet and will drop down. And so, a solution to this is to work on days when the temperature is chill-not too hot nor too cold. Despite facing all these problems, I followed the notes from the online videos I did, referring back to which class teaches which designs. Overall, everything went smooth this week.

No comments:

Post a Comment